The Quick Answer
Size the channel for actual flow: typically 2–4 feet wide and 6–12 inches deep for residential runoff, lined with fabric and mixed stone from 1 inch to boulders. Cost is roughly $10–$25/sq ft DIY.
The Witty Breakdown
A dry creek is a functional swale wearing a costume. If it's not on the actual water path with real slope, it's just a rock stripe.
Vary stone size and let it curve naturally. Uniform round stones in a straight line look exactly like what they are: a drainage ditch.
Step-by-Step Fix
- 1
Trace the natural water path during a storm and mark it.
- 2
Excavate a shallow channel with 1–2% slope toward a legal discharge point.
- 3
Lay geotextile fabric, then place large anchor boulders first, filling with mixed stone.
- 4
Plant sedges and grasses along the banks to hold the edges.

Pro-Tip / Do Not Do This
Don't discharge a dry creek onto your neighbor's property. That's a concentrated flow, and that's the part that's actually illegal.